Hydroelectric Power Plants:

Maximize Productivity and Availability for Hydroelectric Power Plants

For over 40 years, Altus has been delivering technology to power generation projects, providing a fully customizable Digital Control and Supervision System tailored to meet the needs of both large hydroelectric plants and smaller power stations.

Ask for a advisory

Do you want to implement your current project with us? We will be happy to advise you!

Digital Supervision and Control for Hydroelectric Power

Altus offers an innovative solution for modernizing the digital supervision and control systems in hydroelectric power plants and stations. Leveraging state-of-the-art technology, our solution delivers enhanced efficiency, safety, and reliability in managing these critical facilities.

Equipped with advanced automation tools and robust RTUs, we provide intelligent, integrated process management to ensure continuous operation and optimized energy output.

Discover how our solution can improve your hydroelectric power generation unit:

linhahx

High-Availability Control

A arquitetura típica de uma UAC é composta por um bastidor principal da Série HX com redundância de fontes de alimentação e CPU, em que os processadores comunicam via protocolo DNP3. O sistema também possui outros bastidores com módulos de entradas e saídas da Série HX para controle e coleta de dados.

sistemas-distribuidos

Distributed systems

The system features thousands of I/O points distributed across conventional or pressurized remote panels, all connected to process instrumentation through field networks. This setup ensures comprehensive control and data collection across the plant

comando-a-distancia

Remote Supervision and Control

Our solution offers a sophisticated Remote Supervision and Control system that ensures precise operation and efficient monitoring. With Ethernet and DNP3 communication, IRIG-B synchronization, and support for MODBUS-RTU, it guarantees high reliability and performance

redes-de-comunicação

Reliable Communication Networks

The topology incorporates a dual redundant ring network to maximize availability. Special switches with dual optical ports interconnect the rings, ensuring that the plant continues operating through the redundant ring in the event of a failure on one side

Services Included with the DCS

– Delivery of executive and software design projects

– Software project implementation

– Factory Acceptance Testing (FAT) and field commissioning

– Training for maintenance and operations staff

– Full documentation, including updates reflecting the new system implementation

Equipment Provided with the DCS

– Comprehensive SCADA system (including screens, commands, reports, alarms, and event center)

– Switches for the dual optical ring network

– Synchronization relays for substation lines

– Standard 19" rack-mounted servers

– Integration with water intake UACs via single-mode fiber optic cables, including spares, using the IEC 104 protocol

Robustez e desempenho extraordinário com as UTRs da SérieHX

Featured Projects

Paulo Afonso Complex

Altus was responsible for the modernization of the CHESF hydroelectric plant complex, formed by Paulo Afonso I, II and III, in Bahia. The system has 13 Acquisition and Control Units (UACs) with the capacity to produce 1.41 GW, synchronized via GPS, and interconnected in a redundant Fast Ethernet network with dual optical ring technology.

The company also supplied the acquisition and control systems, assembly and disassembly of medium voltage equipment and cubicles. With the modernization, it is possible to manage the complex through a centralized operations room and the CHESF Operations Center in Pernambuco. Thus, analyses and decision-making can be done in real time.
paulo-afonso

Featured Projects

Nilo Pecanha HPP

Inaugurated in 1953, the Nilo Peçanha Hydroelectric Plant is part of the Lajes Hydroelectric Complex, located in Piraí, Rio de Janeiro. With six generating units and a 312-meter drop, the plant has an installed capacity of 380 MW.

In 2016, Light Energia began modernizing the plant’s Digital Supervision and Control System using Hadron Xtorm technology. The project encompasses control and data acquisition logic, alongside a new supervisory system, which also extends control and monitoring capabilities to COG Light in Rio de Janeiro.
nilo-peçanha

You should also check

Oil and Gas

Production efficiency and high availability for Oil and Gas applications

Chek out

Electrical Energy

Performance and high availability for the Electric Power industry

Chek out

Process Industry

Boost efficiency and productivity in the Process Industry

Chek out

Manufacturing Industry

High performance and availability for the Manufacturing Industry

Chek out

Infrastructure

Integrated solutions for Infrastructure and Transportation

Chek out