Barra dos Coqueiros Wind Farm

DCS for Barra dos Coqueiros Wind Farm

Altus was selected to provide the control and supervision system for the wind farm, as well as the protection and control system for the Step-Up Substation, and to upgrade the protection system of the Porto Substation.

Modernization of Wind Farm and Substations

With 26 wind turbines, each generating 1.3 MW, the farm has a total capacity of up to 33.8 MW. The turbines are connected to the National Interconnected System (SIN) via the Porto Substation, operated by Energisa.

The modernization carried out by Altus enabled full remote control of both the farm’s operations and the energy substations. The new supervision and control system allows operators to monitor breaker and disconnector status, track electrical parameters for the Step-Up Substation and wind turbines, and remotely open and close all substation breakers.
Modernização de Painéis

Panel Modernization

Reduction in space and wiring, resulting in increased reliability, cost savings, and enhanced supervision and control capabilities

Supervisão e Controle Remoto

Remote Supervision and Control

Substation operations and interlocks are managed remotely, reducing operator risk

Maior Disponibilidade

Increased Availability

Reduced downtime through rapid fault detection and identification across the system

Diagnósticos Precisos

Accurate Diagnostics

Improved communication system reliability and robustness, with enhanced line diagnostics

Modernização da SE Porto

Porto Substation Modernization

As part of the upgrades at the wind farm, Altus carried out a retrofit of the Porto Substation in Sergipe. The substation infrastructure was modernized to accommodate two new lines from the Step-Up Substation. This included an upgrade to the existing line and transformer protection, along with the installation of a transfer bay, allowing for switching between lines.

Modernização da SE Elevatória

Step-Up Substation Modernization

The Step-Up Substation conditions voltage to connect the wind farm to the Porto Substation. It consists of two transformers, each with primary and backup differential protection, and DNP3.0 communication with the control and operations center located at the wind farm.

Altus provided control and protection for the entire substation using RET670 protection relays. The company also integrated the auxiliary panel power meters with the supervisory system via the Modbus/TCP protocol.

Redes de Comunicação

Reliable Communication Networks

The system developed and implemented by the Altus engineering team uses DNP3 and Modbus TCP communication protocols, as well as the OPC UA standard.

The OPC UA protocol facilitates the transmission of data and commands from the wind farm to the Enex operations center via a remote link. It is also used for communication between the unit’s DCS and the wind turbine supervision software, enabling data exchange between servers and providing operational insights on turbine conditions, fully integrating the processes.

The DNP3 protocol is used for communication between the Porto and Step-Up Substations and the wind farm’s central control and supervision system.

Meanwhile, the Modbus TCP standard is employed for communication between the DCS, power meters, and battery chargers.

Escopo da solução fornecida pela Altus

Scope of the Solution Provided by Altus

- Electrical design of protection, metering, and control panels for Substations and the Control House
- Billing metering system using ION technology
- Modernization of the protection and control system for the Porto Substation in Sergipe
- Development of the supervision and control system for the wind farm and the Step-Up Substation
- Integration of the supervisory system with the Sinovel control server, responsible for managing the wind turbines
- Integration with the anemometric tower, with data collection for submission to the Ministry of Mines and Energy
- Training in system operation and maintenance